Completed Air Barrier So here is a run though of the important connections of our air barrier as we begin to prep for our 1st blower door test: 1) Sub Slab Radon Barrier - We installed a complete single sheet radon barrier before we laid down the sub slab insulation. This barrier was sealed and taped to the ICF foundation wall --------------------------------------------------------------------------------------------------------------------- 2) Basement Wall - The inner most EPS foam of the ICF will serve as the air barrier from the radon barrier to the rim joist. --------------------------------------------------------------------------------------------------------------------- 3) Rim Joist - (See previous Post on the Rim Joist HERE ) Before laying the flooring system we draped Solitex Mento over the poured ICF wall. This is what us Passive House Tradesmen call the " Floppy Bit ". The Mento wrapped the rim board and was sealed to our above grade wall with Vana Tape....