Outer Wall Assembly A lot has been happening! Since the last post we have... Completed the Breezeway and Garage Foundation Completed the Septic System Completed the Outer Wall Assembly (We'll refer to it as the Cladding Wall from now on) (View of the Front and South Side) (View of the Back) (View of the North Side) Needless to say we have turned a few heads. The most common question is w here the windows are going or why are they covered up? Simply put, we are not just going to say we are building a super tight house, we are going to test it before any insulation, drywall, windows, plumbing, or electric is installed to ensure its tightness. And then after those other components are installed we can test again to check those individual components for air tightness. When we are ready to perform the initial blower door I will go into this into a little more detail. Lets take a look at the Cladding Wall Assembly and Details: ...