Day 1

Things are starting to move a little faster. I received a phone call today from the Mendon Building Department, that our Permit is ready to be picked up (and of course paid for). So as of tomorrow I will have a permit. Right now we have a tentative break ground date of August 3rd. We will be ordering our European windows soon, and have to close on our construction loan. So far everything is in line for the Passive House Certification.

I am planing on almost daily posts to bring everyone up to date. I need to go into more detail on our window choice and comparison to standard american windows, our ventilation decision and design, our water heater choices and ductless mini split options. I also will go into a little bit more detail on thermal bridges and two dimensional heat transfer analysis - for all of the thermodynamics nerds out there.

 There is a cascade of decisions that will need to be made very early because the windows and doors have such a long lead time (up to 15 weeks!). We have decided on a wooden front door - so the interior stain needs to go with interior trim, interior doors, flooring, etc. The exterior color of the front door impacts our entire exterior color scheme (or so my wife tells me;))

Why a wooden front door? Our other option is a uPVC door. uPVC is a European PVC. the environmental regulations are different in Europe - so the blowing agent of the PVC has no CFC's. This would be fine, but uPVC cannot be painted. You choose your color and a foil skin is adhered to the door at the factory. We liked the option to "refinish" or "repaint" the door someday if we ever paint the house or re-side the house. So wood it is.

That's about it for tonight - Check back soon for more on Windows coming soon!





Comments

Popular posts from this blog

Window Installation

With all of the engineering and design that goes into a house like this, why would window installation be any different? EVERYTHING in a passive house is modeled, examined, and optimized thermodynamically. For now we will be talking about the thermodynamic analysis of the Passive House Windows and how this translates to the positioning of the windows within the wall system. A typical new construction window comes with a nailing flange that is part of the frame of the window. This requires the window to be nailed directly to the wall, resulting in the window being flush with the outer edge of the exterior wall. Passive House windows don't come with the nailing flange, this allows flexibility in location of installation within the wall system. The fact is, in a thick wall (12 inches or more, further details on wall thickness will be addressed in a later post) you typically don't want to install the window on the outside of your wall. You want to install the window in the middle o...

Wall Assembly 1

Double Wall Construction Maybe I am biased to double wall construction because the company I work for Airtight Services  is a cellulose insulation company; but it is still probably the most cost effective way to achieve the R-values necessary for Passive House. Based on our energy model we needed to achieve about an R-54 wall. There were a couple options: 2x6 wall with 6" of polyisocyanurate rigid foam to the outside There are some more difficult window installation details when your window is cantilevered over nothing but foam. Some long screws are need to attached a furring strip over the rigid foam (9" long) and those can add considerable cost to the project - upwards of $0.75 each The labels on rigid foam insulation scared me a little bit too -  15 YEAR LIMITED THERMAL WARRANTY Polyisocyanurate has the WORST embodied energy of the good types of insulation meaning it takes the most amount of energy to make relative to how much it will save This graph was posted on Green Bu...