Window Delivery

Zola Window Delivery

On Friday we received our delivery of windows from overseas! It was both nerve racking and exciting. I've heard plenty of stories of domestic window shipments being delivered with broken windows and incorrect items. The fact that these windows were shipped all the way from Poland and not just across the country created additional concern for safe transport. Turned out there was no need to worry-the windows were expertly packaged! 

Zola provided us with a "what to expect" form. They recommended having 8 people on hand and a skid steer to help unload the shipment. The shipping cost included a 2 hour time frame to unload the shipment. We would be charged accordingly if the unload took longer. There would also be extra charges if we delayed the shipment for a day or 2. 

When I spoke with the shipping company on Wednesday to set up a time on Friday they said it was a 40 foot long shipping container. This only made me more nervous - how the heck could we unload a 40 foot shipping container in 2 hours without breaking anything.

I contacted Zola and asked if they could send me the "pre-packaged photo" so we could set up a game plan. They were very accommodating and sent the photo right over.

(Sent from Zola prior to window delivery)

This photo eased some of the stress. The whole container was not even 1/2 full, it was just all they had available to send when the windows were packaged. 

We set the delivery time up for around 9am. The driver communicated with us very well to ensure prompt delivery. 


Right on time!

We had to cut the locking pin off

Next we had to photograph the contents to make sure nothing appeared tampered with or broken. I can see Zola has done this before. 
Next we did an inventory - all 5 pallets were accounted for




Again, I was very impressed at how everything was packaged! 

Now the challenge began, we didn't have a pallet jack available to use, so we hooked a chain up to the pallets and dragged them to the end of the container with the skid steer

Then we had to spin the load so the skid steer could lift them out and set them on the ground. 

Once everything was out of the container I inventoried the shipment for completeness - PERFECT!
Our major lesson learned was a skid steer is a must, there is no way we could have unloaded these in the allotted time without one!

Here are a few stats on the Zola Passive uPVC series windows and doors:
  • 8 lbs per square foot
  • U: 0.11 (R-9) *Remember the glass is R-11 and the frame is R-7 so the larger windows are more efficient than the smaller ones
Window Cost Breakdown:
  • Passive House uPVC Triple Pane Windows were $23 per sqft 
  • Passive House uPVC Triple Pane Doors were $65 per sqft
  • Passive House Wooden Front Door was $135 per sqft
  • Double Pane uPVC Windows $15 per sqft (but they are still U:0.2 or R-5)
  • We paid extra for some solar heat gain adjustments (0.6 on south side and 0.3 on east and west side) so that increased the cost slightly
  • We paid extra for custom removable screens on all operable windows 
Total window package with screens, tax, duty and shipping was $30,900. 

The addition of window mullions would have just about doubled the cost of the windows, so be mindful of these during any future projects you may have. 

Now for comparison - an Anderson 400 Series wood window will cost $33 per sqft. This kind of proves the theory there is no correlation between window efficiency and cost among different manufacturers.

Zola Passive House uPVC Window -            U:0.11 (R-9), SHGC 0.50, $23 per sqft
Anderson 400 Series wood window -            U:0.29 (R-3), SHGC 0.31, $33 per sqft 


On my next post I will be going into more detail on the framing and designing for air tightness as we have to perfectly seal the joint between the foundation and the flooring system and the walls.





Comments

Popular posts from this blog

Window Installation

With all of the engineering and design that goes into a house like this, why would window installation be any different? EVERYTHING in a passive house is modeled, examined, and optimized thermodynamically. For now we will be talking about the thermodynamic analysis of the Passive House Windows and how this translates to the positioning of the windows within the wall system. A typical new construction window comes with a nailing flange that is part of the frame of the window. This requires the window to be nailed directly to the wall, resulting in the window being flush with the outer edge of the exterior wall. Passive House windows don't come with the nailing flange, this allows flexibility in location of installation within the wall system. The fact is, in a thick wall (12 inches or more, further details on wall thickness will be addressed in a later post) you typically don't want to install the window on the outside of your wall. You want to install the window in the middle o...

Wall Assembly 1

Double Wall Construction Maybe I am biased to double wall construction because the company I work for Airtight Services  is a cellulose insulation company; but it is still probably the most cost effective way to achieve the R-values necessary for Passive House. Based on our energy model we needed to achieve about an R-54 wall. There were a couple options: 2x6 wall with 6" of polyisocyanurate rigid foam to the outside There are some more difficult window installation details when your window is cantilevered over nothing but foam. Some long screws are need to attached a furring strip over the rigid foam (9" long) and those can add considerable cost to the project - upwards of $0.75 each The labels on rigid foam insulation scared me a little bit too -  15 YEAR LIMITED THERMAL WARRANTY Polyisocyanurate has the WORST embodied energy of the good types of insulation meaning it takes the most amount of energy to make relative to how much it will save This graph was posted on Green Bu...