 I have compiled a list of video's I shot during the construction of Rochester Passive House.
All of the Video's can be found by searching "Rochester Passive House" in Youtube

Enjoy!

One of the 1st Video's I took was during the window delivery. They are heavy! We unloaded the container with a skid stear and had to push them into an on site storage container.


This group of 3 video's shows what we needed to do to raise the outer wall of our double wall assembly when the inner wall was already built






This video shows the setup and plumbing of our drain water heat exchanger.


This video shows the installation techniques of damp spray cellulose. This wall is an interior wall for sound deadening, but you can see the installation from both sides of the wall.

This video shows the technique we used to complete the insulation of our attic when we cannot see the levels of insulation. We need to maintain at least 24" of blown cellulose in the attic.

 Here is a video I created a week or so before we moved in.

Finally, Here is a video of the blower door set up and test


Hope you can make the Open House!



Comments

Popular posts from this blog

Window Installation

With all of the engineering and design that goes into a house like this, why would window installation be any different? EVERYTHING in a passive house is modeled, examined, and optimized thermodynamically. For now we will be talking about the thermodynamic analysis of the Passive House Windows and how this translates to the positioning of the windows within the wall system. A typical new construction window comes with a nailing flange that is part of the frame of the window. This requires the window to be nailed directly to the wall, resulting in the window being flush with the outer edge of the exterior wall. Passive House windows don't come with the nailing flange, this allows flexibility in location of installation within the wall system. The fact is, in a thick wall (12 inches or more, further details on wall thickness will be addressed in a later post) you typically don't want to install the window on the outside of your wall. You want to install the window in the middle o...

Wall Assembly 1

Double Wall Construction Maybe I am biased to double wall construction because the company I work for Airtight Services  is a cellulose insulation company; but it is still probably the most cost effective way to achieve the R-values necessary for Passive House. Based on our energy model we needed to achieve about an R-54 wall. There were a couple options: 2x6 wall with 6" of polyisocyanurate rigid foam to the outside There are some more difficult window installation details when your window is cantilevered over nothing but foam. Some long screws are need to attached a furring strip over the rigid foam (9" long) and those can add considerable cost to the project - upwards of $0.75 each The labels on rigid foam insulation scared me a little bit too -  15 YEAR LIMITED THERMAL WARRANTY Polyisocyanurate has the WORST embodied energy of the good types of insulation meaning it takes the most amount of energy to make relative to how much it will save This graph was posted on Green Bu...