Well we've been in the house for almost a year now, and we are just now getting all of the necessary documents sent to Passive House Academy (PHA) for final certification.

The big remaining items are:
  • Installation PSI values for our windows - results for this will be in a separate blog post. 
  • Zehnder Commissioning to verify airflow in each room and ensure proper balancing from the supply and exhaust from the unit
  • Official Blower Door Test
So this post will go into some depth on what is required for the Passive House Institute Airtight Test


Calculate the House Air Volume
This is maybe the biggest difference between the ASTM and European Standard. We calculate the air volume of the house from slab to interior drywall and exclude ALL interior wall and floor air volumes. Essentially the "visible air volume" inside the house.

Sketchup makes this much easier!

I broke up the volume into 4 components
Volume of the Basement = 8,888 cuft

 Volume of the 1st Floor = 9,896 cuft
 Volume of the 2nd Floor is = 8,727 cuft
Volume of the Staircase Shaft is = 1,846 cuft

This give me a total volume of 29,357
(and just over 2900 sqft for those keeping score at home).

For you PHUIS people - my surface area is 6371 sqft

Here are my results from the official PHI Test:

Multi-point Depressurization


Final Depressurization : 51 CFM50

Multi-point Pressurization


Final Depressurization : 49 CFM50

Average per PHI Standard = 50 CFM50 => 0.10 ACH50

Now for the actual test. Enjoy the videos!

Blower Door Setup


Airtightness test with Duct Blaster Ring 3




Airtightness test with Blower Door Ring D



So here are our results:

Rochester Passive House is one of the tightest in the world!


Comments

Popular posts from this blog

Window Installation

With all of the engineering and design that goes into a house like this, why would window installation be any different? EVERYTHING in a passive house is modeled, examined, and optimized thermodynamically. For now we will be talking about the thermodynamic analysis of the Passive House Windows and how this translates to the positioning of the windows within the wall system. A typical new construction window comes with a nailing flange that is part of the frame of the window. This requires the window to be nailed directly to the wall, resulting in the window being flush with the outer edge of the exterior wall. Passive House windows don't come with the nailing flange, this allows flexibility in location of installation within the wall system. The fact is, in a thick wall (12 inches or more, further details on wall thickness will be addressed in a later post) you typically don't want to install the window on the outside of your wall. You want to install the window in the middle o...

Wall Assembly 1

Double Wall Construction Maybe I am biased to double wall construction because the company I work for Airtight Services  is a cellulose insulation company; but it is still probably the most cost effective way to achieve the R-values necessary for Passive House. Based on our energy model we needed to achieve about an R-54 wall. There were a couple options: 2x6 wall with 6" of polyisocyanurate rigid foam to the outside There are some more difficult window installation details when your window is cantilevered over nothing but foam. Some long screws are need to attached a furring strip over the rigid foam (9" long) and those can add considerable cost to the project - upwards of $0.75 each The labels on rigid foam insulation scared me a little bit too -  15 YEAR LIMITED THERMAL WARRANTY Polyisocyanurate has the WORST embodied energy of the good types of insulation meaning it takes the most amount of energy to make relative to how much it will save This graph was posted on Green Bu...